金沙娱场城(8087-中国VIP认证)-Official Partner

案例详情
Case detail

Yingde Wise hardware products Co., Ltd.

  • 【Case type】

    Electroplating

  • 【Sludge type】

    Electroplating surface treatment sludge

  • 【Front-end dehydration mode】

    Mechanical plate and frame pressure filtration dewatering

  • 【Water rate of wet mud】

    65%

  • 【Mud production】

    14t/day

Project: Yingde Wise hardware products Co., Ltd.

Construction time: 2021. 

Sludge type: Electroplating surface treatment sludge. 

Front-end dewatering: Mechanical plate and frame pressure filtration dewatering. 

Moisture content of wet sludge: 65%. 

Target moisture content of sludge drying: 30%. 

Sludge production: 14t/day


COPYRIGHT © 2021 Guangdong Jikang Environmental System Technology Co., Ltd | Copyright statement

Map XML Design:Onedi

亿鸽在线客服系统